The laying of the pavement reinforcement network should be under the surface layer formation, compaction, and removal of hard surface protrusions.
·ӽW(wng)O(sh)ǰ(yng)O(sh)Ӌ(j)ӮFᔹ̶ӽW(wng)˲ÿ8x̶
Pavement reinforcement before the laying of the width of the pavement should be drawn in the pavement layer to draw white lines, with nails fixed end of the reinforcement net (8 meters wide with nails, uniform distance from the fixed).
̶üӽW(wng)˲˹ӽW(wng)ǰ䁣ÿ10L˹o{(dio)ֱһֱһ꣬һͬǰ
After fixing the end of the reinforced net, the artificial net will be pulled forward slowly. Every 10 meters long will be tightened and straightened until the roll is finished. Then roll the next roll.
·ӽW(wng)O(sh)r(sh)oչƽᔹ̶c·NаŤ
When laying the pavement reinforcement mesh, it must be tightened and flattened and fixed with the nails, and the pavement surface shall not be wrinkled and twisted.
һÉ·C(j)ǰM(jn)c(din)뉺һ鼴O(sh)m(x)ӽW(wng)
Paved a roll with the roller along the way from the starting point of rolling again to lay the follow-up reinforcement.
һwzһO(sh)|(zh)ȻһΣO(sh)r(sh)ӿpL10cm~15cmFᔻľĹ̶^m(x)O(sh)
After laying out a volume and then check the overall quality of a laying, and then pave the next section, when the lap laying lap length of 10cm ~ 15cm, and fixed with nails or wood and then continue laying.